
DC Right of Way & Public Space Permits - Expert Expediting Services
Navigating Washington DC's Complex Public Space / ROW Permit Process with Insider Expertise
Free 15-Minute Consultation - (202) 729-8272
“Serving Washington DC contractors, developers, and infrastructure projects since 2000"
Building Beyond Your Property Line? You’ll Need DDOT Approval
Anytime your project extends into the public right-of-way, DDOT requires permits to ensure safety and compliance. Common examples include:
New driveways or curb cuts
Sidewalk or streetscape improvements
Outdoor dining spaces
Construction staging zones
Utility connections
We provide end-to-end support for all major DDOT right-of-way public space permit types in Washington, DC.
🚗 Curb Cut Permits
Required for new driveways, garage access, and commercial loading zones.
☕ Sidewalk Café Permits
Approvals for outdoor dining spaces and commercial sidewalk use.
🏗️ Construction Staging Permits
Temporary use of public space for materials, equipment, and work zones.
🚦 Traffic Control Plans (TCPs)
Professional DDOT-compliant traffic management plans for safe lane and sidewalk closures.
🌳 Tree Removal & Protection Permits
Required approvals when work may impact or remove public trees.
🌆 Streetscape Permits
For landscaping, lighting, and other streetscape improvements.
Trusted Experts in DDOT Compliance
🚀 Faster Approvals – Established DDOT relationships cut approval times by 3–4 weeks.
✅ Error-Free Submissions – First-time approvals reduce delays and costs.
🚦 Traffic Control Expertise – Certified specialists create safe, compliant TCPs.
🔗 Comprehensive Coordination – We handle DC Water, Pepco, and DCRA requirements, too.
🏛️ 20+ Years of DC Experience – We know neighborhood-specific challenges before they arise.
Call For a Free Permit Assessment: 202-729-8272
A Streamlined Path to Approval
Site Assessment – Evaluate project impact and permit needs.
Application Preparation – Compile drawings, engineering plans, and TCPs.
DDOT Coordination – Submit applications and maintain reviewer contact.
Approval Management – Track daily progress and resolve issues.
Permit Delivery – Secure final approvals and documentation.
Frequently Asked Questions: Public Space Permits in DC
What is a Public Space Permit in Washington, DC?
A Public Space Permit is required for any work or activity that impacts public areas such as sidewalks, streets, alleys, or tree space. This includes excavation, staging, curb cuts, sidewalk cafés, and streetscape improvements.
When do I need a Public Space Permit?
You need a Public Space Permit any time your project extends beyond private property into the public right-of-way. Common examples include utility connections, driveway installations, sidewalk repairs, and construction staging.
How long does it take to get approval from DDOT?
Timelines vary depending on the complexity of the project. Simple permits may be approved within 2–4 weeks, while complex projects requiring multiple agency reviews may take 6–8 weeks or more.
Do I need a Traffic Control Plan with my application?
Yes, most projects impacting streets, alleys, or sidewalks require a Traffic Control Plan (TCP) that meets DDOT standards. Our team prepares TCPs to ensure safety and compliance while minimizing project delays.
Can MCG Permit Consultants handle the entire process?
Absolutely. We manage the entire application process, coordinate with DDOT reviewers, prepare supporting documents, and track approvals to save you time and avoid costly delays.